1.Indicates that a supply order was created for a quantity less than the minimum quantity set in Product Planning Data.2.Indicates that a supply order was not released when it was due, and should be either released or expedited now, or the demand rescheduled for a later date.3.Indicates that reversal movement will be created, if disabled the original movement will be deleted.4.Indicates that the Product Planning Data for this product does not specify a valid network distribution.
5.Indicates that there is an unsatisfied material requirement inside the planning time fence for this product. You should either manually schedule and expedite orders to fill this demand or delay fulfillment of the requirement that created the demand.6.Indicates the Date an item was ordered.
Date Ordered is the date when the order was generated. If the MO is created manually the default date ordered is the system date. If the MO was generated by MRP the default date ordered is the day of the MRP process.
7.Indicates what release the package is for. Entering no specific release indicates the package is for all releases.8.Indicates whether planned orders will be generated by MRP, if this flag is not just MRP generate a 'Create' action notice
9.Introduce the Name to identify the operations from the manufacturing routing. If desired give a Description for activity.10.It is a list of all the subassemblies, intermediates, parts and raw material that go into a parent assembly showing the quantity of each required to make an assembly. There are a variety of display formats of bill of material, including single level bill of material, indented bill of material, modular (planning), costed bill of material, etc. May also be called \"formula\", \"recipe\", \"ingredients list\" in certain industries.
It answers the question, what are the components of the product?
11.It is a report of every Manufacturing Orders filtering according with the characteristics the user is interested to select.
12.It is a set of techniques which uses the planned orders by MRP, open manufacturing orders, manufacturing resources and the work-flows to calculate the required time for each resource along with the available time. With this information, we are able to balance the time demand with the available time. Through the knowledge of the required and available capacities it is possible to adjust the Master Production Schedule(MPS) until we arrive at a realistic one.13.Enter the password for your account provided by the post code web service provider14.Enter the ClientID or Login for your account provided by the post code web service provider15.Enter the password for your account provided by the post code web service provider前面12条与第二篇一样,增加了后面三条。

解决方案 »

  1.   

    好像是什么ERP,SAP的产品说明……
      

  2.   

    13 输入邮政代码Web服务供应商提供您的帐户密码
    14 输入代码的网页,邮政服务供应商提供您的帐户中的ClientID或登录
    15和13是一样的 前面12条你都知道了就不告诉你了
      

  3.   

    1.Indicates that a supply order was created for a quantity less than the minimum quantity set in Product Planning Data.
    说明:订货单在当数量少于在产品规划数据制定的最小数量集的时候被创建
    2.Indicates that a supply order was not released when it was due, and should be either released or expedited now, or the demand rescheduled for a later date.
    说明:供应订单由于过期了,但是却没有被释放,那么应该要么被释放,要么加快处理,否则就必须重新制定更晚日期的计划
    3.Indicates that reversal movement will be created, if disabled the original movement will be deleted.
    说明:如果禁用了原始操作将被删除,撤销操作将被创建
    4.Indicates that the Product Planning Data for this product does not specify a valid network distribution.
    说明:针对于产品的产品规划数据不表明一个有效的网络布局5.Indicates that there is an unsatisfied material requirement inside the planning time fence for this product. You should either manually schedule and expedite orders to fill this demand or delay fulfillment of the requirement that created the demand.说明:对于该产品在计划时间栏内存在不能满足的物料需求的时候,你必须要么手工制定计划或者迅速的调整以满足要求,要么延期执行创建需求的指令
    6.
    Date Ordered is the date when the order was generated. If the MO is created manually the default date ordered is the system date. If the MO was generated by MRP the default date ordered is the day of the MRP process.
    7.Indicates what release the package is for. Entering no specific release indicates the package is for all releases.说明:包开放给谁.不输入指定开放指令则表明包是开放给所有8.Indicates whether planned orders will be generated by MRP, if this flag is not just MRP generate a 'Create' action notice说明:如果该标志是否,只是MRP产生的一个“创建”指令,是否MRP将产生计划订单
    9.Introduce the Name to identify the operations from the manufacturing routing. If desired give a Description for activity.
    如果希望给操作一个描述的话,可以从制作业途径采用名字去区分
    13.Enter the password for your account provided by the post code web service provider
    录入邮政编码web服务供应商提供给您的帐户密码
    14.Enter the ClientID or Login for your account provided by the post code web service provider
    录入ClientID或者录入邮政编码web服务供应商提供给您的账户进行登录